This day in bridge engineering history

| | Comments (0) | TrackBacks (1)

Lynne Kiesling

I like Wired's "This Day in Tech" feature. Today's feature is this day in bridge history: March 4, 1890, the opening of the Forth Bridge across the Firth of Forth, north of Edinburgh in Scotland.

Three 330-foot towers went up, each atop four separate foundations. The towers cantilevered out toward one another, not quite touching. Machinery hoisted two 350-foot truss spans into place to be supported by the ends of the cantilever arms. Result: two clear spans of 1,710 feet each and a total length of 5,350 feet, not counting the approaches.

The muscular design, with its massive cross-bracing and 58,000 tons of steel, was hailed as a triumph of Victorian engineering on its completion in 1890.

The length of the total span, and the wind patterns in the Firth, make it important to have a really strong bridge, which had not been possible before this effort.

1 TrackBacks

Listed below are links to blogs that reference this entry: This day in bridge engineering history.

TrackBack URL for this entry: http://www.knowledgeproblem.com/mt/mt-tb.cgi/1397

shoes from http://wwwbestshoes.info on April 1, 2008 12:20 AM

Site presents shoes. Read More

Leave a comment


Type the characters you see in the picture above.

August 2008

Sun Mon Tue Wed Thu Fri Sat
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31            

Contact

Lynne Kiesling
Lynne-at-knowledgeproblem-dot-com

Michael Giberson
Mike-at-knowledgeproblem-dot-com

Archives

Creative Commons License
This weblog is licensed under a Creative Commons License.
Powered by Movable Type 4.1