The sentence that stops me: "trying to govern a changing electricity system with categories designed for a world that no longer exists." That's the AI hardware problem stated perfectly. The grid's regulatory operating system is vintage 1920. The GPU's thermodynamic operating system is vintage 1970. Both are running out of runway simultaneously. The question is which gets reformed first.

Michael J Denton, PE, PhD's avatar

Love this piece, and sudden changes definitely stress test the existing physics and economics. The uncertainty around future data center demand also greatly complicates the planning. How long will that transformational spread (value of compute per cost of mwh) hold? If it doesn't last as long as planned, stranded assets and write-offs are in someone's future. Remember fiber optic capacity markets?